Electro-Techniques Control and Plant Commissioning
Skilled Personnel ensures a smooth implementation

Experienced electrical and commissioning engineers, PLC engineers and continually trained staff take care of the technically flawless planning and programming of manually and PLC controlled waste water treatment plants. The automatic control of the systems is usually done with S7 ® PLCs and HMI touch panels (WinCC flexible ® or ProTool ®). Other systems such as Rockwell/Allen Bradley, Mitsubishi, Phoenix, etc. can also be implemented. Wiring diagrams are created with EPlan P8.

The installation and commissioning of our plants are conducted by our experienced commissioning engineers. Furthermore, the proper instruction and training of operating personnel at the plant takes place in parallel to the commissioning and during and after the startup phase. These proven practices as well as a technically detailed, comprehensive documentation guarantee a smooth plant operation. Renewals and extensions of systems are carried out with a minimum interruption of operation.

Teleservice / Remote Diagnosis
In all of our PLC control facilities, a remote diagnostic tool (via telephone modem, ISDN modem, VPN access, etc.) can be integrated. Through this fastest service can be guaranteed in case of plant disturbances. Using conection via teleservice module we have direct access to your system control and can trace and remedy e.g. plant- and PLC disturbances or - according to agreement with your operators - optimize control parameters etc.